Sunday, June 13, 2010

Week 10 - 7th-12th June 2010

Week 10 was busy and it started off with a bad weather. Anew documentation needed to be done, Fabrication Punchlist. Switchgear room's atmosphere was a little bit tension. Things did not go well as many part of the switchgear need to be corrected. This time I followed Mr. Florante for the Fire Water line walk. Pipes used in this system are made out of a material named Glass Re-enforcement Epoxy (GRE). It is cheaper and long lasting. Obtained an overview of how nitrogen generator system and its usage. It acts more like a filter. The speed of the nitrogen's flow will affect its purity. SSpP-5510 & SSP-5530 went through a in-house checking. Troubleshooting, Megger Test and readings like starting and running amps were performed. I was explained on our GENSET. What are the main components and how synchronization works are stored in my head. After troubleshooting both the SSP, 24 hours of endurance test was carried out. In terms of safety, I was showed the proper way of dealing with high voltage cables. A practice that should be remembers at all time. Lead-Lag Process was performed on the air compressors. Comp. 1 (Lead) and comp. 2 (Lag) will be running based on the settings set by client. Comp. 1 works as normal while comp. 2 works as a back-up.

No comments:

Post a Comment