On the week 9, I decided to have a walk to module 1 & module 2. Technician, Mr. Sam was performing Ducter and Megger Test on one of the DB. Vendor switchgear came for troubleshooting and testing throughout this whole week. Have a "line walk" with Mr. Florante, piping lead engineer. He is kind to share with me his knowledge although I am from electrical background. Line walk consists of checking the progress on site as well as components of pipes. P&ID are vital in this scope. On Thursday, there will be testing on lighting and socket outlet and I'm glad to be able to participate in it. Mr. Farid gave me a chance to offer testing for client on socket outlet. It went well and the result was good, 33ms (tripping time). A bad news strikes us in the next morning toolbox meeting. Our "anaconda" cable was broken and needed to be replaced. Replacement was carried out with checking the new cable's condition. Resistance and Megger Test were performed. Did some documentation like sorting out all types of motors in all modules together with its voltage, power and current values.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment