Week 8 - 24th-29th May 2010

After 2 months in MMHE, experiences and technical skills here are difficult to obtain elsewhere. This week started off with a little bit slower but managed to pick up towards the end. I was focusing myself on drawing and single line diagram. Mainly on 6.6kV switchgear panel. Module 7 will soon go through weighing and therefore cables below it needed to be clear. Progress on helideck was good. Almost everything was prepared to be tested. A big change since I last visited. Found 2 more types of lighting, indication and flood light. Fourth day of the week, I participated in testing of Potable Water Pump and Wash Water Pump. Uncoupled test run or solo-run test was carried out to see motor's original performance. Temp., rotation, vibration, rpm, starting & running amp, winding resistance & isolation and Megger test were performed on each motor. SSP-5510 and SSP-5530 went through a Current Injection Test (CIT). It checked the tripping time of the circuit breaker with it's percentage load. Usually 75%, 100%, 200% and 300% more than it's normal maximum value are injected using Current Injector.



Glanding equipment

Glanding process

Helideck view 1

Helideck view 2

Indication light-gives signal to helicopter

Potable Water Pump

Tacho Meter-measure rpm

Vibration meter-vibration of motor

Clamp meter-measure staring & running amp

Phase rotation meter-measure rotation

Megger Tester

Temperature gun

starting & running amp testing

Vibration testing

Current Injector

CIT test in progress