Monday, May 17, 2010

Week 6 - 10th-15th May 2010

In week 6, I went through the "Electrical Checksheet Overview" for Petronas Carigali Sdn Bhd. We can find system number, system description, equipment description, construction inspection sheet (CS) and functional test sheet (FS). CS and FS are so important for Testing & Commissioning as a prove of work completion and also verified by client. Visited MSF as there is a problem with the air compressor. Water are dripping in the panel during rain. Had discussion to solve while waiting for vendors to come. I was introduced to Uninterrupted Power Supply (UPS) and explained of its function.


Sample of checksheet overview


Water in panel !!


Problem solving


UPS panel


UPS flow