Had a toolbox meeting at 7.45am. After the toolbox meeting, I had 1 hour safety introduction briefing by Mr. Abu Bakar regarding the safety and precaution procedures about "Tangga Barat" project. I obtained a sticker by attending the safety talk which will stick at the safety helmet. This sticker acts as a permission to enter the site area.



After that, I studied each module's documentation including the flow diagram, single line diagram, power, control, heater, lighting, small power cable and types of circuit breakers. Also, did some preparations before entering site tomorrow.