Sunday, June 27, 2010
Week 12 - 21st-25th June 2010
Sunday, June 20, 2010
Week 11 - 14th-19th June 2010
Sunday, June 13, 2010
Week 10 - 7th-12th June 2010
Monday, June 7, 2010
Week 9 - 31st May-5th June 2010
Sunday, May 30, 2010
Week 8 - 24th-29th May 2010

Glanding process

Helideck view 1

Helideck view 2

Indication light-gives signal to helicopter

Potable Water Pump

Tacho Meter-measure rpm

Vibration meter-vibration of motor

Clamp meter-measure staring & running amp

Phase rotation meter-measure rotation

Megger Tester

Temperature gun

starting & running amp testing

Vibration testing

Current Injector

CIT test in progress
Monday, May 24, 2010
Week 7 - 17th-22nd May 2010

Star-Delta connection

Soft Starter Panel for 6.6kV Switchgear

Direct On Line (DOL) Starter

Feeder

GENSET (green-temporary generator)

Finding fault in voltage stabilizer

True Clamp Meter

Mr. Kamal, Mr. Shahrizal & Mr. Suhaimi

RCU panel

Checking lighting status (Mr. Suhaimi)
Monday, May 17, 2010
Week 6 - 10th-15th May 2010

Sample of checksheet overview

Water in panel !!

Problem solving

UPS panel

UPS flow
Monday, May 10, 2010
Week 5 - 3rd-8th May 2010

Helideck

PMCS

Parameter light

CCR Room layout

Vendor changing drawer indication position

SSP 5510 & SSP 5530

LOTO system

Vibrotip report

Confined space briefing

Reticulation report

Megger Test

Megger equipment

3 phase cables

*Control test*
Sunday, May 2, 2010
Week 4 - 26th-30th April 2010
RCCB Digital Tester
Briefing before Torque Check & Ducter Test
Busbar
Torque Check Tool
Digital Low Resistance Ohmmeter
Mr. Farid & Mr. Kamal showing the steps to perform Ducter Test
Bad day @.@
Blackout at switchgear room